Installation & Commissioning

AES employs a dedicated team of 15 installation engineers and can carry out all mechanical and electrical works required for a full project installation. Over the last 15 years we have supplied and fitted over 2000 LEV systems with geographical coverage ranging from the Channel Islands to the Shetland Islands.


Installation

Our dedicated installation squad provide our customers with the highest quality installations in the quickest turnaround possible. Our projects team work closely with our customers providing full fit-outs of LEV installation projects from initial enquiry to final handover.

Health and Safety is at the core of our values and the majority of our engineers hold the Construction Industry's Site Supervisor's Safety Certification (SSSC) with several having the Site Manager's Safety Certificate (SMSC). Our depth of experience and supporting infrastructure means that we have the ability to carry out several installations simultaneously at different locations throughout the UK. AES holds a number of industry leading accreditations including SafeContractor, CHAS, Constructionline (Gold Status), SELECT and Gas Safe.


Commissioning

On completion of installation works all systems undergo a commissioning process in accordance with the guidance published in HSG 258 - Controlling Airborne Contaminants. This process consists of three stages as follows:

Confirmation of Mechanical and Electrical Performance.

The systems are first checked to ensure that all mechanical and electrical components are operating as designed and intended. This may include initial balancing of system, checks on automatic valves, filter cleaning systems, inverter set up and calibration of airflow indicators. Where necessary, electrical works completion certificated will be provided.  All systems will then be commissioned by a qualified engineer to ensure that they are controlling the hazardous substance in accordance with the COSHH regulations and HSG 258 guidance.

Measure of Technical Performance

Once it has been established that the system is installed and performing as designed and intended, the technical performance of the system is measured by a LEV commissioning engineer. This exercise will measure duct velocities, static pressures and hood velocities and flowrates. this information will form the basis of the commissioning report and be used as a benchmark for future Thorough Examination and Tests.

Proof of Control Effectiveness

The final stage is to prove that the system is controlling the hazardous substance it has been designed for. This may include a variety of qualitative or quantitative test as follows:

  • Dust Lamp (Tyndall Beam Illumination): This method allows visualisation of the dust or fume emitted by the process and allows the commissioning engineer to access how well the contaminant is being extracted
  • Smoke Tests: Tracer smoke can be used to visualise airflow and to demonstrate the effective range of capture hoods. Where this is carried out a label showing the capture distance will be fixed to the hood.
  • Real Time Dust/Aerosol Monitors: A hand-held laser photometer which measures real-time concentration of dust can give a direct readout of actual dust levels. This method can give qualitative information into the actual deductions in potential exposure achieved by the system.
  • Personal/Static Sampling: Personal or static sampling can be carried out for a wide range of dust types and chemical fume. Personal sampling is the HSE recognised methodology for determining whether exposure is being controlled to the Workplace Exposure Limit (WEL). AES staff hold BOHS accredited W501 qualification for measurement of hazardous substances.

Production of commissioning report, user manual and logbook.

Once all site works have been completed the commissioning engineer will work with our office administration team to produce all documentation required by the customer to fulfil their responsibilities under the COSHH Regulations. For each system we will compile a manual or electronic folder containing the following information:

  • Commissioning report detailing technical performance and proof of effective control
  • User manual containing system design, intended operating performance, maintenance checks and instructions for future Thorough Examination and Testing.
  • System drawings
  • Manufacturer's manuals for individual components e.g. fans , filters
  • User weekly check sheet
  • System log sheet to record maintenance work, filter replacements etc.

Please note that all products on shopaessolutions.co.uk are sold on a supply-only basis, and do not include any installation or commissioning labour.